Employer / Administration
General Directorate of Highways 7th Regional Directorate
Earthworks, Engineering Works, Bridge, Viaducts, Tunnel and Pavement Works between Ordu-Ulubey Junction and Topçam (1.Section) Km: 0+000 - 15+448,91 in Ordu - Mesudiye - Koyulhisar State Highway
Earthworks, engineering works, bridge works, tunnel works, viaducts and superstructure works
In the scope of the project, major works can be filtered as follows: 770.000 m3 earthwork, 60.000 m3 concrete work, 4.000 tons of rebar installation and bored pile construction of 3.300 m in total.