Kadıköy Kurbağalıdere River Rehabilitation

Employer / Administration

İstanbul Metropolitan Municipality Department of Infrastructure and Construction Directorate of Infrastructural Services

Project Name

Kadıköy Kurbağalıdere River Rehabilitation

Project Scope

River Rehabilitation and Connection Roads Regulation

Date of Contract

14.11.2012

Explanation

Main works executed in the scope of the project were 765.000 m3 earthwork, 110.000 m3 concrete work, bored pile work of 44.000 m, 4 pcs. of pre-tensionning and 10 pcs. of post-tensionning bridge construction of 400 m in total. Also, some of the pipework such as Ø3000 mm tunnel construction of 1.560 m of length with TBM and wastewater collection network set with Ø1600, Ø2000, Ø2600 mm reinforced pipes of 4.000 m of length has been completed.