Employer / Administration
Kocaeli Metropolitan Municipality ISU General Management
Wastewater Supply Station, Network, Tunnel - Microtunnel and collector Lines Construction in Darıca and Gebze Territories
2,500 m TBM Tunnel Construction Ductile Cast Iron, Corrugated and Reinforced Concrete Piping Works
Comprising mainly 12.235 m of sewage network construction, the scope of project also includes the construction of 3 supply stations, a tunnel which is 2.450 m of length and 260 m micro-tunnel.