Gürpınar Çanta Waste Water Tunnel Construction

Employer / Administration

Istanbul Potable and Wastewater Administration (ISKI)

Project Name

Gürpınar ve Çanta Wastewater Tunnel Construction

Project Scope

6.015 m. Ǿ 2000 mm. Tunnel and 6 No. Tunnel Shaft

Date of Contract

24.11.2011

Explanation

6.015 m of Ø 2000 mm wastewater tunnel and 6 pieces of shaft construction were in the scope. 42.500 m3 tunnel excavation, 3.200 m3 shaft excavation and 9.300 m3 pre-cast concrete work were also performed.