European Side 1. Section Wastewater Tunnel Construction

Employer / Administration

İstanbul Water and Sewerage Administration İSKİ General Directorate

Project Name

European Side 1. Section Wastewater Tunnel Construction

Project Scope

Wastewater tunnel, shaft construction

Date of Contract

24.01.2008

Explanation

11.723 m wastewater tunnel having a ⌀2000 mm diameter, 2 branch tunnels with ⌀1800/1200 mm diameter having a total length of 680 m, 19 tunnel shafts, 2 branch shafts were constructed in the scope of the project.