Employer / Administration
Directorate of 7. Region Other Budget Institutions General Directorate of Highways
Completion Construction of Ordu Ring Road in the Section of Km: 21+000 - 42+414,784
Earthworks, engineering works, bridge, tunnel, plant-mix base and bituminous hot mixture works
The construction project of the 21 km 2x2 highway comprises a wide range of works including but not limited to the following: Construction of a double-tube double-lane tunnel which is 4.200 m of length, execution of 1.300.000 m3 earthwork, 500.000 m3 reinforced concrete work, 1950 m viaduct construction in total and 180.000 t asphalt work.